How long does a typical office fit out take in London?

A small suite takes two weeks. A full floor takes four to six weeks. Fleet works fast without cutting corners.

Yes. Night and weekend work is standard. The team cleans up every evening. Offices stay open as usual.

Yes. Every partition has certification for fire resistance and acoustic performance. Building control sign off provided with every job.

Fleet supplies everything. Partitions. Ceilings. Flooring. Doors. Paint. Kitchens. One invoice. One warranty. No hassle.

CAT A is shell and core. Basic services only. CAT B is full interior fit out. Partitions, ceilings, floors, and finishes.

Yes. Public liability insurance up to five million pounds. CHAS accredited. SafeContractor approved. Full documentation available on request.

Yes. Wider doors. Level access. Accessible tea points. Fleet ensures every office meets Equality Act 2010 requirements.

Yes. Twelve months on all workmanship. Fire doors and partitions have longer certifications. Full details in every quotation.

Call the Fleet team or fill the contact form. A site survey follows within three days. Fixed price quote within one week.